Connecting Safety with Data,
Technology that Protects People

Combining visual site inspections with intelligent analysis data
to precisely identify easily missed potential hazards.

MOBILE BRIDGE AD
CORE VALUE

Intelligent Safety Analysis Partner
for Practical Hazard Identification

Systematic Data Matching

Proposals are based on a database built through the analysis of numerous task scenarios.

ANALYSIS GUIDES

Hazard Analysis Guide for 9 High-Risk Operations

LATEST CASE STUDIES

Field Case Studies

JSA Risk Assessment Preview: Overhead Equipment Installation using a MEWP (Scissor Lift)

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for Overhead Equipment Installation using a Mobile Elevating Work Platform (MEWP / Scissor Lift), in full compliance with UK statutory regulations, including the Work at Height Regulations 2005 (WAHR), PUWER, and IPAF guidelines. To mitigate severe hazards such as fatal trapping against overhead steelwork, catastrophic overturning from travelling whilst elevated, falls from the platform, and dropped tools striking ground operatives, the workflow is categorised into six detailed phases: pre-task travel route inspection with a banksman, PUWER functional testing of safety devices, overhead clearance verification with active secondary guarding, strict prohibition of standing on guardrails, lowering before relocation, and safe parking/charging protocols. Site Managers, Principal Contractors, and MEWP Coordinators can seamlessly integrate this guidance into Risk Assessments and Method Statements (RAMS) and MEWP Rescue Plans to enforce UK compliance and eliminate powered access fatalities and overturning incidents on construction sites.

8/18/2026
JSA Risk Assessment Preview: Tube and Fitting Scaffold Dismantling

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for Tube and Fitting Scaffold Dismantling, in full compliance with UK statutory regulations, specifically the Work at Height Regulations 2005 (WAHR) and NASC guidelines TG20:21 and SG4:22. To mitigate severe hazards such as total scaffold collapse due to the premature removal of lower wall ties, fatal falls during board removal, and lethal struck-by incidents from dropped steel tubes, the workflow is categorised into six detailed phases: ground exclusion zone enforcement, securing SG4:22-compliant fall protection, strict top-down sequential wall tie dismantling, two-person fitting release, controlled mechanical material lowering via gin wheel, and rapid ground sorting in stillages. Temporary Works Coordinators, Principal Contractors, and Scaffolding Supervisors can seamlessly integrate this guidance into Risk Assessments and Method Statements (RAMS) and Demolition Plans to enforce UK compliance and eliminate catastrophic temporary structure failures and falling object fatalities on construction sites.

8/18/2026
JSA Risk Assessment Preview: System Scaffold Erection and Installation

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for System Scaffold Erection and Installation, in full compliance with UK statutory regulations, specifically the Work at Height Regulations 2005 (WAHR) and NASC guidelines TG20:21 and SG4:22. To mitigate severe hazards such as structural collapse due to differential settlement, domino-effect collapse from missing wall ties during high winds, fatal falls during erection, and struck-by incidents from dropped tools, the workflow is categorised into six detailed phases: safe material unloading, foundation preparation with timber sole boards, wedge-secured standard and ledger assembly, SG4:22-compliant platform installation, critical wall tie anchorage to prevent buckling, and a final statutory handover inspection by a CISRS-qualified scaffolder. Temporary Works Coordinators, Principal Contractors, and Scaffolding Supervisors can seamlessly integrate this guidance into Risk Assessments and Method Statements (RAMS) and Scaffold Erection Plans to enforce UK compliance and eliminate catastrophic temporary structure failures and fall fatalities on construction sites.

8/17/2026
JSA Risk Assessment Preview: Temporary Road Barricade and Fence Installation

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for Temporary Road Barricade and Fence Installation, in full compliance with UK statutory regulations including the HSE's CDM 2015, NRSWA, and Chapter 8 of the Traffic Signs Manual. To mitigate severe hazards such as high-speed vehicle intrusions, crushing injuries during material unloading, wind-induced fence blow-overs, and struck-by accidents during night-time setups, the workflow is categorised into six detailed phases: Chapter 8-compliant advance warning and taper setup, safe exclusion zones for unloading, structural ballast securing for bases, wind-load monitored panel assembly, protected visibility device installation, and sequential traffic management removal. Site Managers, Temporary Works Coordinators, and Principal Contractors can seamlessly integrate this guidance into Risk Assessments and Method Statements (RAMS) and Temporary Traffic Management (TTM) Plans to enforce UK compliance and eliminate catastrophic work zone collisions and structural failures on public carriageways.

8/17/2026
JSA Risk Assessment Preview: Construction Waste Loading and Removal Operations

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for Construction Waste Loading and Removal Operations, in full compliance with UK HSE regulations, including CDM 2015, PUWER, and the Work at Height Regulations 2005 (WAHR). To mitigate severe hazards such as blind-spot crushing by reversing tipper lorries, struck-by incidents within an excavator's slew zone, fatal falls during manual sheeting, and traffic collisions at site gates, the workflow is categorised into six detailed phases: controlled waste accumulation, banksman-guided reversing, barricaded excavator loading, engineered fall protection for load sheeting, safe wheel wash decontamination, and traffic marshal-controlled site egress. Site Managers, Principal Contractors, and Plant Coordinators can seamlessly integrate this guidance into Risk Assessments and Method Statements (RAMS) and Site Logistics Plans to enforce UK statutory compliance and eliminate catastrophic heavy plant accidents on construction sites.

8/11/2026
JSA Risk Assessment Preview: Underground Tunnel Blasting and Drilling Operations

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for Underground Tunnel Blasting and Drilling Operations, in full compliance with UK statutory regulations, including the Explosives Regulations 2014 (ER 2014), BS 6164, and COSHH. To mitigate severe hazards such as unexpected detonations from drilling into sockets (misfires), premature explosions triggered by static or RF energy, blast overpressure exposure, and toxic gas asphyxiation, the workflow is categorised into six detailed phases: mechanised scaling and marking using MEWPs, safe drilling jumbo setup guided by banksmen, mandatory face washdown and socket inspection prior to drilling, strict anti-static explosives charging, controlled circuit testing by a Shotfirer, and mechanical ventilation with quantitative gas testing before re-entry. Appointed Shotfirers, Site Managers, and Principal Contractors can seamlessly integrate this guidance into Risk Assessments and Method Statements (RAMS) to enforce UK compliance and eliminate catastrophic explosions and toxic gas fatalities in underground headings.

8/11/2026