CONSTRUCTION JSA SAMPLES

Construction JSASample Guide (10 Types)

Check core hazards and measures for each process. Review imagesand download the original PDF via the button below.

CONST-01

Ceiling Frame Installation and Drywall Attachment

⚠ Core Hazards

Fall from unlocked ladder hinges, nail gun accidents

🛡 Control Measures

Visual check of lock engagement, wear cut-resistant gloves and safety glasses

Preview Sample (Image)

Ceiling Frame Installation and Drywall Attachment Preview
CONST-02

Main Piping Welding and Pump Installation in Mechanical Room

⚠ Core Hazards

Fire from welding spatter, burst during pressure testing

🛡 Control Measures

Assign fire watch, incremental pressurisation within 1.1x design pressure

Preview Sample (Image)

Main Piping Welding and Pump Installation in Mechanical Room Preview
CONST-03

Excavation and Backfilling for Drainage Systems

⚠ Core Hazards

Explosion from underground utility damage, burial due to slope failure

🛡 Control Measures

Utility detection combined with manual digging, maintain safe slope

Preview Sample (Image)

Excavation and Backfilling for Drainage Systems Preview
CONST-04

Roof Urethane Waterproofing and Exterior Water-based Painting

⚠ Core Hazards

Fall from roof edges, asphyxiation from solvent vapours

🛡 Control Measures

Secure lifeline to safety harness, implement forced ventilation via fans

Preview Sample (Image)

Roof Urethane Waterproofing and Exterior Water-based Painting Preview
CONST-05

Exterior Wall Maintenance and High-elevation Equipment Installation

⚠ Core Hazards

Fall due to rope failure, crushing by MEWPs (Rental)

🛡 Control Measures

Install separate vertical lifelines, inspect over-travel prevention devices

Preview Sample (Image)

Exterior Wall Maintenance and High-elevation Equipment Installation Preview
CONST-06

System Scaffolding Installation and Dismantling for Exterior Work

⚠ Core Hazards

Entire structure collapse, impact from falling components

🛡 Control Measures

Install wall ties according to standards, establish ground exclusion zones

Preview Sample (Image)

System Scaffolding Installation and Dismantling for Exterior Work Preview
CONST-07

Rebar Processing and Crane Lifting Work

⚠ Core Hazards

Material fall due to hitching gear failure, processing machine entanglement

🛡 Control Measures

Follow 2-line hitching rules, use dedicated push sticks during processing

Preview Sample (Image)

Rebar Processing and Crane Lifting Work Preview
CONST-08

Slab and Beam Concrete Pouring Work

⚠ Core Hazards

Pump truck tip-over, impact from hose detachment and whipping

🛡 Control Measures

Reinforce outrigger ground, inspect connection pins and rings

Preview Sample (Image)

Slab and Beam Concrete Pouring Work Preview
CONST-09

Demolition of Old Low-rise Structures and Waste Removal

⚠ Core Hazards

Sudden collapse during demolition, risk of asbestos exposure

🛡 Control Measures

Follow Top-down demolition principle, verify pre-demolition asbestos survey

Preview Sample (Image)

Demolition of Old Low-rise Structures and Waste Removal Preview
CONST-10

Ceiling Electrical Wiring and Fire Safety Equipment Installation

⚠ Core Hazards

Electric shock from live parts, fall due to body over-extension on ladders

🛡 Control Measures

Implement panel LOTO, verify zero voltage with detector

Preview Sample (Image)

Ceiling Electrical Wiring and Fire Safety Equipment Installation Preview