Connecting Safety with Data,
Technology that Protects People

Combining visual site inspections with intelligent analysis data
to precisely identify easily missed potential hazards.

MOBILE BRIDGE AD
CORE VALUE

Intelligent Safety Analysis Partner
for Practical Hazard Identification

Systematic Data Matching

Proposals are based on a database built through the analysis of numerous task scenarios.

ANALYSIS GUIDES

Hazard Analysis Guide for 9 High-Risk Operations

LATEST CASE STUDIES

Field Case Studies

JSA Risk Assessment Preview: Overhead Equipment Installation using an EWP (Scissor Lift)

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for Overhead Equipment Installation using an Elevating Work Platform (EWP / Scissor Lift), in full compliance with Australian statutory regulations, including the WHS Regulations, AS 2550.10, and EWPA guidelines. To mitigate severe hazards such as fatal trapping against overhead steelwork, catastrophic overturning from travelling whilst elevated, falls from the platform, and dropped tools striking ground workers, the workflow is categorised into six detailed phases: pre-task travel route inspection with a spotter, AS 2550.10 pre-start logbook checks, overhead clearance verification with active secondary guarding, strict prohibition of standing on guardrails, lowering before relocation, and safe parking/charging protocols. Site Supervisors, Principal Contractors, and EWP Operators can seamlessly integrate this guidance into Safe Work Method Statements (SWMS) and Emergency Rescue Plans to enforce Australian compliance and eliminate powered access fatalities and overturning incidents on construction sites.

8/18/2026
JSA Risk Assessment Preview: Tube and Coupler Scaffold Dismantling

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for Tube and Coupler Scaffold Dismantling, in full compliance with Australian statutory regulations, specifically the WHS Regulations, Safe Work Australia Codes of Practice, and AS/NZS 4576. To mitigate severe hazards such as total scaffold collapse due to premature removal of lower wall ties, fatal falls during deck removal, and lethal struck-by incidents from dropped steel tubes, the workflow is categorised into six detailed phases: ground drop zone exclusion, securing independent twin-tail lanyard fall protection, strict top-down sequential wall tie dismantling supervised by an HRWL scaffolder, two-person coupler release, controlled mechanical material lowering (gin wheel/rope), and rapid ground sorting in stillages. Site Supervisors, Principal Contractors, and Scaffolding Contractors can seamlessly integrate this guidance into Safe Work Method Statements (SWMS) and Demolition Plans to enforce Australian compliance and eliminate catastrophic temporary structure failures and falling object fatalities on construction sites.

8/18/2026
JSA Risk Assessment Preview: System Scaffold Erection and Installation

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for System Scaffold Erection and Installation, in full compliance with Australian statutory regulations, specifically the WHS Regulations, Safe Work Australia (SWA) Codes of Practice, and AS/NZS 1576/4576. To mitigate severe hazards such as structural collapse due to differential settlement, domino-effect collapse from missing wall ties during high winds, fatal falls during erection, and struck-by incidents from dropped tools, the workflow is categorised into six detailed phases: safe material unloading, foundation preparation with timber soleboards, wedge-secured standard and ledger assembly, fall-arrest protected platform installation, critical wall tie anchorage to prevent buckling, and a final statutory Handover Certificate inspection by a licensed scaffolder. Site Supervisors, Principal Contractors, and Scaffolding Contractors can seamlessly integrate this guidance into Safe Work Method Statements (SWMS) and Scaffold Erection Plans to enforce Australian compliance and eliminate catastrophic temporary structure failures and fall fatalities on construction sites.

8/17/2026
JSA Risk Assessment Preview: Temporary Road Barricade and Fence Installation

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for Temporary Road Barricade and Fence Installation, in full compliance with Australian statutory regulations including the WHS Regulations, AS 1742.3, and Austroads AGTTM. To mitigate severe hazards such as high-speed vehicle intrusions, crushing injuries during material unloading, wind-induced fence blow-overs, and struck-by accidents during night-time setups, the workflow is categorised into six detailed phases: AGTTM-compliant advance warning and taper setup, safe exclusion zones for unloading, structural ballast securing for bases, wind-load monitored panel assembly, protected visibility device installation, and sequential traffic management removal. Site Supervisors, Traffic Management Designers, and Principal Contractors can seamlessly integrate this guidance into Safe Work Method Statements (SWMS) and Traffic Management Plans (TMP) to enforce Australian compliance and eliminate catastrophic work zone collisions and structural failures on public carriageways.

8/17/2026
JSA Risk Assessment Preview: Construction Waste Loading and Removal Operations

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for Construction Waste Loading and Removal Operations, in full compliance with Australian WHS Regulations and Safe Work Australia (SWA) Codes of Practice. To mitigate severe hazards such as blind-spot crushing by reversing dump trucks, struck-by incidents within an excavator's slew zone, fatal falls during manual tarping, and traffic collisions at site gates, the workflow is categorised into six detailed phases: controlled waste accumulation, spotter-guided reversing, barricaded excavator loading, engineered fall protection for load tarping, safe wheel wash decontamination, and Traffic Controller-managed site egress. Site Supervisors, Principal Contractors, and Plant Coordinators can seamlessly integrate this guidance into Safe Work Method Statements (SWMS) for High Risk Construction Work (HRCW) and Traffic Management Plans to enforce Australian statutory compliance and eliminate catastrophic heavy plant accidents on construction sites.

8/11/2026
JSA Risk Assessment Preview: Underground Tunnel Blasting and Drilling Operations

This standardised Job Safety Analysis (JSA / Risk Assessment) guide outlines critical safety protocols for Underground Tunnel Blasting and Drilling Operations, in full compliance with Australian WHS Regulations, Safe Work Australia (SWA) Codes of Practice, and AS 2187 standards. To mitigate severe hazards such as unexpected detonations from drilling into sockets (misfires), premature explosions triggered by static or RF energy, blast overpressure exposure, and toxic gas asphyxiation, the workflow is categorised into six detailed phases: mechanised scaling and marking using EWPs, safe drilling jumbo setup guided by spotters, mandatory face washdown and socket inspection prior to drilling, strict anti-static explosives charging, controlled circuit testing by a licensed Shotfirer, and mechanical ventilation with quantitative gas testing before re-entry. Licensed Shotfirers, Site Supervisors, and Principal Contractors can seamlessly integrate this guidance into Safe Work Method Statements (SWMS) to enforce Australian statutory compliance and eliminate catastrophic explosions and toxic gas fatalities in underground headings.

8/11/2026