Smart JSA Bridge

⚠️ [Caution] This sample is for reference only. Risk assessments must be conducted based on actual onsite checks.Smart JSA Bridge is not responsible for legal consequences from using this material.

CONSTRUCTION JSA SAMPLES

Construction JSASample Guide (10 Types)

Check core hazards and measures for each process. Review imagesand download the original PDF via the button below.

CONST-01

Ceiling Frame Installation and Drywall Attachment

⚠ Core Hazards

Fall from unlocked ladder hinges, nail gun accidents

🛡 Mitigation Measures

Visual check of lock engagement, wear cut-resistant gloves and safety glasses

Preview Sample (Image)

Ceiling Frame Installation and Drywall Attachment Preview
CONST-02

Main Piping Welding and Pump Installation in Mechanical Room

⚠ Core Hazards

Fire from welding spatter, burst during pressure testing

🛡 Mitigation Measures

Assign fire watch, incremental pressurization within 1.1x design pressure

Preview Sample (Image)

Main Piping Welding and Pump Installation in Mechanical Room Preview
CONST-03

Excavation and Backfilling for Drainage Systems

⚠ Core Hazards

Explosion from underground utility damage, burial due to slope failure

🛡 Mitigation Measures

Utility detection combined with manual digging, maintain safe slope

Preview Sample (Image)

Excavation and Backfilling for Drainage Systems Preview
CONST-04

Roof Urethane Waterproofing and Exterior Water-based Painting

⚠ Core Hazards

Fall from roof edges, asphyxiation from solvent vapors

🛡 Mitigation Measures

Secure lifeline to safety harness, implement forced ventilation via fans

Preview Sample (Image)

Roof Urethane Waterproofing and Exterior Water-based Painting Preview
CONST-05

Exterior Wall Maintenance and High-elevation Equipment Installation

⚠ Core Hazards

Fall due to rope failure, crushing by MEWPs (Rental)

🛡 Mitigation Measures

Install separate vertical lifelines, inspect over-travel prevention devices

Preview Sample (Image)

Exterior Wall Maintenance and High-elevation Equipment Installation Preview
CONST-06

System Scaffolding Installation and Dismantling for Exterior Work

⚠ Core Hazards

Entire structure collapse, impact from falling components

🛡 Mitigation Measures

Install wall ties according to standards, establish ground exclusion zones

Preview Sample (Image)

System Scaffolding Installation and Dismantling for Exterior Work Preview
CONST-07

Rebar Processing and Crane Lifting Work

⚠ Core Hazards

Material fall due to hitching gear failure, processing machine entanglement

🛡 Mitigation Measures

Follow 2-line hitching rules, use dedicated push sticks during processing

Preview Sample (Image)

Rebar Processing and Crane Lifting Work Preview
CONST-08

Slab and Beam Concrete Pouring Work

⚠ Core Hazards

Pump truck tip-over, impact from hose detachment and whipping

🛡 Mitigation Measures

Reinforce outrigger ground, inspect connection pins and rings

Preview Sample (Image)

Slab and Beam Concrete Pouring Work Preview
CONST-09

Demolition of Old Low-rise Structures and Waste Removal

⚠ Core Hazards

Sudden collapse during demolition, risk of asbestos exposure

🛡 Mitigation Measures

Follow Top-down demolition principle, verify pre-demolition asbestos survey

Preview Sample (Image)

Demolition of Old Low-rise Structures and Waste Removal Preview
CONST-10

Ceiling Electrical Wiring and Fire Safety Equipment Installation

⚠ Core Hazards

Electric shock from live parts, fall due to body over-extension on ladders

🛡 Mitigation Measures

Implement panel LOTO, verify zero voltage with detector

Preview Sample (Image)

Ceiling Electrical Wiring and Fire Safety Equipment Installation Preview